METRO VANCOUVER NEWS
Tumbler Ridge seeks feedback on designs for new school building
School District 59 is asking Tumbler Ridge residents to weigh in on two concepts for a permanent new secondary school: a prefabricated building or construction on site. A two-week consultation will inform the board’s decision, expected by late winter.

Residents of Tumbler Ridge, B.C., are being asked to comment on designs for a new secondary school. Six people were killed when 18-year-old Jesse Van Rootselaar opened fire at the school on Feb. 10. Before the shooting, Van Rootselaar killed her mother and half-brother at their home. Van Rootselaar died at the school from a self-inflicted gunshot injury.
School District 59 officials began demolishing the school in July, after then-premier David Eby said students could not return to a school where such a devastating event had taken place. The district is now moving ahead with plans for a new school. Chad Anderson, board chair for School District 59, Peace River South, said the district is taking design concepts to the community for consultation on the next steps toward a permanent school.
Anderson said the board has narrowed the options to two: a prefabricated school building or a design built on site. A prefabricated building is largely constructed at an off-site facility and then assembled at the site. Anderson said he hopes the board can select the best features available to create a beautiful facility where students and staff feel safe and comfortable for the long term.
The school board will decide on the construction method after a two-week consultation that includes a survey of Tumbler Ridge residents. Anderson expects a decision by late this winter. He said construction could begin in summer 2027 if all goes well; the timing depends on the construction method selected and the subsequent project schedule.