Back to news

METRO VANCOUVER NEWS

Water main flushing to begin Oct. 19 in Moody Centre

Oct 14, 2026 · Port Moody · City of Port Moody

The City of Port Moody will flush water mains in Moody Centre starting Monday, Oct. 19, 2026, with the work expected to take about six weeks. Residents and businesses may briefly notice discoloured water, pressure changes or sediment; the City says these conditions are not a health hazard.

YoLink AI 资料配图

The City of Port Moody will begin flushing water mains in the Moody Centre neighbourhood on Monday, Oct. 19, 2026. The work is expected to take about six weeks. Residents and businesses may experience temporary discolouration, pressure fluctuations or sediment in their water. If that happens, run cold water in a bathtub or another large fixture until it starts to clear. The City says these conditions should be brief and do not pose a health hazard. For more information, call Operations at 604.469.4574.

The City uses unidirectional flushing to maintain water quality in its distribution system. The process involves strategically closing valves and opening fire hydrants in sections of the system to create high water velocities in targeted mains. Compared with other flushing methods, it uses less water and cleans the inside walls of water mains more effectively.

Read the original source · City of Port Moody

GOOD THINGS HAPPEN HERE

Download Yo! Vancouver

Scan with your phone camera to discover more local favourites.

Scan to download Yo! Vancouver

Or choose your app store

Download on the App StoreGet it on Google Play